Spector Lumenex Oil, Gas and Energy Case Study - FPSO Bonga

January 01, 2018

Share

The Shell Bonga FPSO was built in 2 stages. The first was the laying down of the hull and fabrication of the hull equipment in the Samsung shipyards in Korea. The second stage was the fitting of the topside equipment at Amec’s shipyard in the UK.

The system was initially delivered to cover the hull sleeping and working areas of the FPSO with built in capacity to cope with the hook up of the topside equipment. This equipment was provided later under a separate contract awarded by the topside engineering company.

In addition to the supply of the PAGA and Page Party System, Spector Lumenex also supplied a PAGA Training System to assist in the training of the vessel’s staff.