- Johnson Controls
- Security
- Security Access Control Systems
- Integrated Solutions
Integrated Solutions
Intelligent, Scalable and Integrated Solutions for Security and Business Applications
We understand the challenges facing many companies today as they require a variety of critical security and business systems to work together to keep their businesses secure and running smoothly. These systems include access control, video, building management, intrusion, fire and the list goes on. That is why we partner with world-class technology companies to offer a comprehensive range of integrations that work together with our physical access control systems (PACS). The integrations combined with our PACS provide a total integrated security management solution to improve efficiencies across businesses through centralised monitoring.
Intelligent
Flexible
Convenient
Video Solutions
View critical situations in real time and significantly increase emergency response
- Display video views, video tours, perform PTZ controls and trigger alarms and events or camera actions when an alarm is triggered
- Seamlessly Integrates with security and event monitoring systems
- Scalable for long-term investment
- View recorded video clips from PACS monitoring station
Intrusion Detection
Monitor and perform intrusion detection within a facility to stop incidents of malicious activity or policy violations
- Central alarm monitoring for fast response times
- Immediately notify security personnel when suspicious activity occurs
- Monitor panel status and arm/disarm partitions from one central location
Fire Alarm Management
Instantly provide visibility of the nature and location of fire and other emergencies
- View critical security and fire events in one interface
- Easily view representation of points, zones, and panels on graphical maps
- Store fire alarm activity for future investigative reporting
License/Number Plate Recognition
Makes vehicle identification easier and eliminates unauthorized access to the facility.
- INEX/ZAMIR ALPR Camera
- Reports by plate, date, and time
- Customizable alerts for flagged or blacklisted plates
Mobile Access
Access to secured doors through a mobile device improves user convenience and operational efficiency.
- AES protection for mobile IDs
- “Tap” or “Twist and Go” door opening options
- Bluetooth Low Energy (BLE) or Near Field Communication (NFC)
Personnel and Visitor Management
Powerful management tools managing personnel and visitors in C•CURE.
- Helps pre-register visitors, individuals or groups
- QR codes used for convenient check-ins
- Data can be stored for as long as needed
Perimeter Detection
Notifies, monitors, acknowledges and cancels alarms via AC2000 access control system.
- Real-time activity viewed directly from application
- Video alarm pop-up features available in the application
- FFT CAMS perimeter defence alarms and events incorporated
Physical Security Information Management
A comprehensive user interface tying disparate systems into one platform.
- Each alarm follows an operating procedure
- Provides real time situation detection
- Both input and output communication available
Real-time Location System
Allows users to track personnel and valuable assets in real-time through C•CURE 9000.
- Associates video with events based on location
- Enhances security of assets and safety of people
- Creates and exports sophisticated reports
Security Wearables
Enforces access control visitor policies in order to provide visual security awareness.
- Visually demonstrates authorized presence
- Reduces risks by ensuring access control compliance
- Delivers a unique visitor management solution
Standard Interface Communication
Integrates third party devices with C•CURE 9000.
- Provides standard interface communication
- Uses ASCII code for communications protocol for event monitoring
- Interprets messages for C•CURE 9000 from third party devices
Stay one step ahead with news and insights from our security experts.
See All Insights






















.jpg?la=en&h=320&w=720&hash=244C75B74F0F77521D56164450973BCD)














.jpg?la=en&h=310&w=720&hash=8D9823F26AA80B2B75C3E4B2E61770DC)


.jpg?la=en&h=320&w=719&hash=13CA7E4AA3E453809B6726B561F2F4DD)
.jpg?la=en&h=306&w=720&hash=F21A7CD3C49EFBF4D41F00691D09AEAC)

.png?la=en&h=320&w=720&hash=18CFCCD916C92D922F600511FABD775D)







